CMR ( REGULATION NO. 77) |

 

           77. New winding installations.

1.    When it is intended to bring into use any new winding installation for lowering and raising of persons, the owner, agent or manager shall, not less than sixty days before such use, give notice of such intention to the Chief Inspector and Regional Inspector in such form as may be specified by the Chief Inspector which shall contain detailed specifications of the installation.

2.    A winding engine which is shifted from one site to the other within the same mine or from one mine to other, shall be considered as a new installation for the purpose of this regulation.

3.    If the Chief Inspector, by an order in writing so requires, such additions or alterations shall be made to the installations, as he may specify in the order.




Post a Comment

0 Comments