1. Whenever supports are to be withdrawn, the withdrawal shall be done in such manner as the manager may by orders specify.
2. The orders referred to in sub-regulation (1) shall cover --
(a) The supply and use of appropriate tools and safety contrivances;
(b) the setting of extra supports to control the collapse of roof from which supports are being withdrawn;
(c) the sequence of withdrawal of supports; withdrawal of a cog to precede withdrawal of its corner props;
(d) safe positioning of the persons engaged in the operation and all other persons present nearby;
(e) training of competent persons who are entrusted with the operations; and
(f) supervision during withdrawal of supports.
3. In every mine where powered supports are used, it shall be the duty of the owner, agent and manager to prepare a plan for the installation of powered supports and a plan for their withdrawal and transport.
4. The plan referred under sub-regulation (3), shall be reviewed and approved, with or without any necessary amendment by the Regional Inspector before implementation.
0 Comments